Course for This AssignmentEE308FZ(Software Engineering)
Assignment RequirementsTeamwork—beta Spring
Team nameFZU Meteorological Bureau
The goal of this Assignmentbeta sprint easy 1

1.Task Overview

The main tasks for this beta sprint include:

  1. Optimization of homepage UI and navigation module: ensuring stable UI experience and functionality.
    1. Optimization of backend interface stability: fixing known backend bugs and optimizing interface performance

2. SCRUM SECTION

2.1Work progress of team members

FZU IDNametaskspend time(h)remaining time(h)
832301213Chen YeComplete the optimization of the homepage carousel component and implement responsive design30
832301102Wang JiaruiOptimized the style and layout of the popular volunteer service cards2.50.5
832301118Li YifeiImplemented the login status display function of the navigation bar30
832301208Zhang ShiminCompleted UI optimization of the search function1.51.5
832301113Sun ChenenThe issue of incomplete filtering of sensitive words during user registration has been resolved21
832301214Chen XuetingThe response speed of the activity list query interface has been optimized2.50.5
832301205Zhang ZhikaiFixed the exception handling issue of the file upload interface21
832301109Liu ZhongboCompleted the stability test of the comment interface1.51.5
832301210Chen HongyuAfter completing the functional testing of the homepage UI, two bugs were discovered30
832301228Lin JuntianCompleted the interface testing of the user module2.50.5
832301115Li YuxinCompleted the formulation of the sprint plan and task allocation1.51.5
832301225Lin QixuanOptimized the color matching and layout of the homepage21

2.2 Code check-in record

link here
在这里插入图片描述
在这里插入图片描述

2.3 conference photos

在这里插入图片描述

3. PM REPORT

3.1 Completed Work

We have finalized task planning and distribution, setting the core directions for UI enhancement and backend stability. The UI team has unified the visual style of the homepage and optimized navigation responsiveness. The backend team has fixed all high-priority bugs and improved key API performance. Initial integration and testing have been completed, and team collaboration mechanisms, including Git workflows and code reviews, have been firmly established.

3.2 Remaining Work

We need to proceed with Beta version testing to collect user feedback and further optimize based on the results. Performance and stability of core interfaces require continued enhancement. Final improvements, project documentation, and a summary of the Beta phase must be completed. Additionally, search and sort functions for the community need implementation, alongside further refinements to the frontend user experience and backend API response speeds.

3.3 Burn-up Chart

在这里插入图片描述

3.4 Latest display

在这里插入图片描述
在这里插入图片描述

Logo

有“AI”的1024 = 2048,欢迎大家加入2048 AI社区

更多推荐